Bathroom Remodel Contractors

Licensed, bonded and insured crews for tile, showers, vanities and permits

Bathroom remodel contractors San Marino CA who finish on schedule

Bathroom remodel contractors San Marino CA homeowners call for a reason: we tear out the old tub, fix what's behind the wall, and rebuild a bathroom that passes inspection the first time. From 1920s Spanish Colonial homes near Lacy Park to newer builds off Monterey Road, our team handles tile, plumbing rough-in, waterproofing and finish work under one California contractor license. Most full bathrooms take three to five weeks.

Live phone supportUpfront optionsBacked workmanship
Call firstLive triage can help before arrival
Safety before speedRisks assessed before work begins
Diagnose the causeWe trace the source, not just the symptom
Approve the workScope and price explained upfront

What's included

What our bathroom remodel service includes

Every full bathroom remodel we take on includes permits, demo, rough-in, waterproofing, tile, fixtures and final inspection. Cosmetic refreshes cover tile, vanity, paint and fixtures without opening walls. We spell out exactly what is in your scope before work starts, so you know what you are paying for and what would be an add-on.

01

Permits and inspections

We file the permit with the city, schedule plumbing and electrical rough-in inspections, and meet the inspector on site. Final sign-off closes the permit and gives you documentation for resale. You never have to call the city yourself.

02

Demo and haul-away

We remove the old tub, toilet, vanity, tile and drywall, then haul everything to the dump. Floors and doorways get protected before demo starts. Most bathrooms demo in one to two days with HEPA filtration running the whole time.

03

Plumbing and electrical rough-in

Supply lines get replaced with PEX or copper where needed, drains get re-sloped, and GFCI outlets and exhaust ventilation get installed to code. All rough-in work is inspected before walls close, so nothing gets buried that should not be.

04

Waterproofing and tile

Cement board goes up, seams get taped and mudded, and a bonded waterproof membrane covers the shower pan and walls. We flood-test the pan for 24 hours, then set tile in your chosen pattern and grout after the thinset cures.

05

Fixtures and finish carpentry

Toilet, vanity, faucets, mirror, lighting, glass and trim all get installed and tested. We caulk every wet joint, check drain slope, and run the exhaust fan to confirm airflow before the final walkthrough.

Service overview

Bathroom remodel contractors San Marino CA: what the work actually involves

Bathroom remodel contractors San Marino CA is the licensed trade category that demolishes, reframes, waterproofs, re-pipes and finishes a bathroom to California Building Code (CBC) standards. A real remodel is not a cosmetic swap. We open the wall, check for water damage and dry rot, replace galvanized supply lines with PEX or copper, pour or patch the shower pan, hang and tape drywall, then set tile over a properly cured substrate. Every step gets inspected before the next one starts.

San Marino's housing stock is old enough that surprises are normal. Plaster walls hide rusted drain lines. Original 1920s bathrooms often have no dedicated vent, so we pull a permit and add one. If you have been searching for bathroom remodel contractors near me San Marino CA and getting vague bids, that vagueness usually means the contractor has not opened a wall in a house like yours. We walk the space, scope the hidden work, and price it before demo day.

Code-correct the first timeWe pull permits through Los Angeles County and build to the California Building Code, not to whatever the last guy guessed. Rough-in plumbing, GFCI outlets, exhaust ventilation and shower pan slope all get inspected before tile goes down. That means no red tags, no re-inspection fees, and no surprise when you sell the house.
Waterproofing that holdsShower failures almost always trace back to skipped waterproofing. We roll a bonded membrane over the pan and walls, flood-test the pan for 24 hours, and only then set tile. A properly waterproofed shower in San Marino's climate should outlast the tile itself by decades.
One crew, one scheduleDemo, framing, plumbing, electrical, drywall, tile and finish carpentry all run through our own crews and vetted subs. You get a written day-by-day schedule and a single point of contact. No chasing four trades who each blame the other for the delay.
CoreNexus Works serving San Marino, California
How we workWe verify the cause, compare realistic options, and confirm the repair before we leave.

The service timeline

How our bathroom remodel process runs

The process flexes to the condition, but these checkpoints keep decisions clear.

01

Walkthrough and scope

We measure the room, check water pressure and drain slope, and look inside the vanity cabinet and under the floor where we can. You get a written scope with line-item pricing within 48 hours. If a wall needs to come open to confirm hidden conditions, we say so before you sign anything.

Stage 1
02

Permits and material selections

We file the permit with the city and pull the plumbing and electrical sign-offs. Meanwhile you pick tile, grout, fixtures and paint from our supplier list or your own. Lead times on imported tile can run three to six weeks, so we lock selections early to keep the schedule intact.

Stage 2
03

Demo and rough-in

Demo takes one to two days. We haul out the old tub, toilet and vanity, then inspect the framing and subfloor. Plumbing and electrical rough-in follows, and the inspector signs off before anything gets closed up. This is the stage where hidden rot or a cracked cast-iron drain gets found and fixed.

Stage 3
04

Waterproofing and tile

We hang cement board, tape and mud the seams, roll the waterproof membrane, and flood-test the shower pan. Tile setting runs three to five days depending on pattern and size. Grout cures 24 to 48 hours before fixtures go back in.

Stage 4
05

Fixtures, punch list, final walk

Toilet, vanity, faucets, mirror, lighting and glass get installed. We caulk every wet joint, test every drain and supply line, and run the exhaust fan. You walk the room with us, we fix anything on your list, and final inspection closes the permit.

Stage 5

Tools & methods

Tools and methods we use

Purpose-built equipment, used by trained technicians, so the job is done accurately the first time.

01

DeWalt and Milwaukee cordless drills

Used for framing, cement board fastening, fixture installation and trim work. Cordless keeps the site clear of trip hazards and lets us work in tight bathroom corners without running extension cords.

02

Makita circular saw and tile saw

Cuts plywood subfloor, framing lumber and tile. A wet tile saw gives clean edges on porcelain and natural stone, which matters on visible cuts around niches and thresholds.

03

Bosch laser level

Sets level lines for tile layout, vanity height and shower pan slope. A laser level keeps grout lines straight across a full wall, which is the difference between a professional tile job and a wavy one.

04

Stanley tape measure and framing square

Layout and verification on every cut. We measure twice because a miscut tile or framing member costs a day of schedule and a trip to the supplier.

05

Concrete mixer and rebar

Used when a shower pan or floor patch needs a poured base. Rebar reinforces the pour so it does not crack underfoot over time.

06

Scaffolding and HEPA filtration

Scaffolding for high ceilings and tall tile walls. HEPA filtration runs during demo to capture drywall dust and silica before it spreads through the house.

Use cases

When San Marino homeowners call us

These examples show how the service framework adapts rather than forcing every call through one repair.

Bathroom Remodel Contractors
1926 Spanish Colonial primary bathroomOriginal pink tile from the 1920s, a cast-iron drain with visible rust at the trap, galvanized supply lines with weak pressure, and no exhaust fan. The shower had leaked into the ceiling below for at least a year. → New cast-iron-to-ABS drain, PEX supply lines, a ducted exhaust fan, a flood-tested shower pan, and period-appropriate tile. Finished in 26 days. Pressure at the shower head went from 2.1 to 4.8 gallons per minute.

Hall bathroom cosmetic refresh

Dated pink tub, worn vinyl floor, single-bulb vanity light, and a vanity cabinet with water damage at the base. Structurally sound, but the finishes had not been touched in 30 years. → Tub-to-shower conversion with new tile surround, porcelain tile floor, new vanity with quartz top, LED lighting and fresh paint. Finished in 11 days. No walls opened, so the permit scope stayed small.

Primary bathroom leak repair and rebuild

Shower had leaked into the ceiling below for months. Drywall was stained and soft, insulation was soaked, and one floor joist had early rot. The original pan had no waterproof membrane. → Ceiling opened and repaired, rotted joist sistered, new shower pan with bonded membrane and a 24-hour flood test, new tile and fixtures. Finished in 22 days. Ceiling below was patched, textured and painted.

Problems we solve

Bathroom problems we fix in San Marino

Older San Marino bathrooms hide problems behind plaster and tile. Here are the ones we run into most often, and what happens if they get ignored.

ISSUE

Shower leaking into the ceiling below

We open the ceiling below, trace the leak to its source, and repair the framing and subfloor. Then we rebuild the shower with a bonded waterproof membrane and flood-test the pan for 24 hours before any tile goes down.

SYMPTOM

Galvanized supply lines with low pressure

We replace the galvanized runs with PEX or copper during the remodel, since the walls are already open. That restores full pressure and eliminates the most common source of emergency leaks in older San Marino homes.

SIGN

No exhaust fan or venting into the attic

We install a properly sized exhaust fan ducted to the exterior through the roof or wall, sized to the room's cubic footage. It runs on a timer or humidistat so it clears moisture after you leave the room.

ALERT

Cracked cast-iron drain under the slab

We camera the drain line during the walkthrough, and if it is failing we replace the affected section with ABS or PVC while the floor is open. That is far cheaper than digging it up later through finished tile.

Pricing process

Bathroom remodel pricing in San Marino

$12,000 - $75,000 depending on scope

Phase 01

Room size and layout

A 5x8 hall bathroom costs less than a 10x12 primary bath with two vanities and a separate tub and shower. Square footage drives tile quantity, drywall, waterproofing and labor hours.

Phase 02

Tile and material grade

Ceramic tile runs a few dollars per square foot. Porcelain, natural stone and large-format slabs can run five to ten times that. Grout, thinset and trim add cost on top of the tile itself.

Phase 03

Plumbing and drain condition

If supply lines and drains are sound, plumbing cost stays low. Replacing galvanized supply lines or a cracked cast-iron drain adds cost, but it is far cheaper while the walls and floor are already open.

Questions before we arrive

Frequently Asked Questions

Bathroom Remodel Contractors
Call (626) 876-0879
How much do bathroom remodel contractors cost in San Marino CA?

A full bathroom remodel in San Marino runs roughly $28,000 to $75,000 in 2026, depending on size, tile selection and how much plumbing gets replaced. A cosmetic refresh with new fixtures and paint can land between $12,000 and $20,000. Hidden conditions like rotted subfloor or cast-iron drain replacement add cost, and we price those before demo whenever possible.

What does a bathroom remodeler do in San Marino California?

A bathroom remodeler handles the whole job: demolition, framing, plumbing rough-in, electrical, waterproofing, drywall, tile, fixture installation and permit sign-off. In San Marino that often means opening plaster walls, replacing galvanized supply lines, adding an exhaust vent, and rebuilding the shower pan to California Building Code. You get one contract and one crew instead of juggling four trades.

How long does a bathroom remodel take in San Marino CA?

A full bathroom takes three to five weeks from demo to final inspection. A cosmetic refresh with new tile, vanity and fixtures runs ten days to two weeks. The biggest schedule variables are tile lead times, which can run three to six weeks on imported material, and inspection scheduling through Los Angeles County. We give you a written day-by-day schedule before work starts.

How do I choose bathroom remodel contractors in San Marino California?

Check three things: a current California Contractor License through the CSLB, bonded and insured coverage, and a written scope with line-item pricing. Ask whether they pull permits and who meets the inspector. Ask how they handle hidden damage. A contractor who cannot answer those questions clearly is a contractor who will hand you change orders later.

Ready when you are

Get a written bathroom remodel quote in San Marino CA

Call (626) 876-0879 and we will schedule a walkthrough, measure the room, and hand you a line-item scope within 48 hours. Licensed, bonded and insured through the CSLB. Most full bathrooms finish in three to five weeks.

Bathroom Remodel Contractors

Talk with the local team

Request Bathroom Remodel Contractors

Call (626) 876-0879 during business hours and you will reach a person, not a voicemail tree. We return every call the same day and schedule walkthroughs within the week. For water damage or storm emergencies, we keep a line open after hours.

2481 Mission St, Suite B, San Marino, CA 91108 United States, San Marino, CaliforniaMain office · technicians serve the full area

Thanks — your request is in. We will contact you shortly.

Call now